The seven wastes
muda · lean waste · eight wastes · waste in lean
Taiichi Ohno's categories for activity that consumes resources without adding anything a customer would pay for: transport, inventory, motion, waiting, overproduction, overprocessing and defects.
In practice
A report nobody reads is overproduction. A file passed between four people is transport. Waiting for an approval is waiting. None of them look like waste from inside, because somebody is busy doing each one.
The common mistake
Using it to justify cutting people. The categories describe activities, not individuals, and the activities are almost always produced by how the work is arranged rather than by who is doing it.
Ohno's categories are a checklist for looking at a process and noticing what is consuming effort without producing anything anyone would pay for. They were written for a factory and they transfer to office work almost unchanged, which is a slightly damning thing to discover.
The test throughout is the same: would the customer pay for this step if they could see it itemized?
The seven
Transport. Moving things between places or people. A document passed through four reviewers has been transported four times. Each handover is a chance to wait, to lose context, and to need a conversation that would have been unnecessary.
Inventory. Work sitting between steps. Half-finished projects, unreviewed drafts, an unworked pipeline. It consumes attention while producing nothing, and it sets wait time for everything behind it — see Little's law.
Motion. Movement within a step that does not advance it. Looking for a file, switching between five tools, re-reading a thread to recover where things stood.
Waiting. Work stalled because something else has not happened. The most common and the most invisible, because the person waiting is usually doing something else and so nobody records the delay.
Overproduction. Making more than is needed, or earlier than it is needed. A weekly report nobody reads. A feature nobody asked for. Ohno considered this the worst of the seven, because overproduction causes the others: it creates inventory, which requires transport, which produces waiting.
Overprocessing. More effort than the outcome requires. Three revisions where one would have been accepted. A document formatted for a presentation that will be read on a phone.
Defects. Work that has to be redone. Expensive not only for the rework but for the disruption: a defect found late pulls people off whatever they had moved on to.
An eighth is usually added now — unused talent, people prevented from contributing what they could by how the work is arranged. Not Ohno's, and a real category.
Why it works better than looking for inefficiency
Because "be more efficient" is not actionable and the seven are. Each one tells you what to look at and what would count as finding something.
It also cuts against the strongest instinct in the room, which is that a busy process is a working one. Every item on the list is somebody being busy. The person transporting a document is working. The person producing an unread report is working. Nothing on this list looks like idleness, which is exactly why it survives review after review.
The two ways it goes wrong
Using it on people. The categories describe activities, and activities are produced by how the work is arranged. A person doing three handovers is not the waste; the arrangement requiring three handovers is. A waste exercise that concludes with a headcount reduction has usually found symptoms and removed the capacity that would have fixed the cause.
Eliminating the wrong waiting. Some waiting is a buffer doing a job, and removing it without fixing what it was absorbing produces the failure it was protecting against. This is the same distinction that governs just-in-time, and it is why waste reduction and margin of safety are not in conflict — one removes activity that produces nothing, the other holds capacity against uncertainty.
Starting
Take one process that people complain about and write down every step, including every wait and every handover. Mark each against the seven. The list is usually longer than expected and the largest item is usually waiting, which nobody had been counting because nobody was idle during it.
Then look at what is producing the waiting rather than at the waiting itself. It is almost always batch size or a handover that exists for a reason nobody remembers.
Concept web
Open the full webQuestions
What are the seven wastes of lean?
Transport, inventory, motion, waiting, overproduction, overprocessing and defects. An eighth, unused talent, is commonly added. The categories come from Taiichi Ohno at Toyota.
Which waste is the most important?
Ohno considered overproduction the worst, because it causes the others: making more than is needed creates inventory, which requires transport, which produces waiting.
Does lean waste reduction mean cutting staff?
No. The categories describe activities, and activities are produced by how work is arranged. A waste exercise that ends in headcount reduction has usually found symptoms and removed the capacity that would have fixed the cause.